This House of Commons committee meeting on the Environment and Sustainable Development studied protecting Canadian residents from extreme weather events. Witnesses included Leslie Muñoz and Louise Wallace Richmond from the Federation of Canadian Municipalities (FCM), Blaine Payne, Mayor of Parson’s Pond, Mathieu Boudreault, a professor at Université du Québec à Montréal, Gary Martin, an individual researcher, and Rebecca Trowell from the Red River Basin Commission.
Leslie Muñoz and Louise Wallace Richmond, representing the FCM, called for a $2 billion immediate federal investment in adaptation infrastructure, followed by $1 billion annually for a decade, arguing that every dollar spent on preparation saves nearly five dollars in future costs. They highlighted that 14% of municipal infrastructure is in poor condition, creating a $294-billion repair backlog, and stressed the need for better support for local emergency management, stronger national coordination, and post-disaster recovery including accessible insurance for high-risk households. They noted that the disaster mitigation and adaptation fund is being wound down and that the new build communities strong fund is not at the necessary pace or scale.
Blaine Payne, Mayor of Parson’s Pond, described severe coastal erosion threatening the town’s only highway, which is the sole access to the entire Northern Peninsula, and stated that resettlement is not an option due to geography and community will. He said that all available funding has requirements too large for his small town to qualify, and that the province has only monitored the erosion without taking protective action, leaving the community unable to address the issue with its limited resources.
Mathieu Boudreault, speaking as an individual, reported that insured losses from extreme weather have increased by 6% annually for 30 years, with 1% to 1.5% directly attributable to climate change, and warned that current adaptation investments are meagre. He recommended creating a Crown corporation to administer a provincial reinsurance program with risk-proportional premiums, supporting resilience certification for buildings, and ensuring that insurance price signals are not artificially capped, except temporarily for low-income households, to avoid encouraging risk-taking.
Gary Martin, as an individual, urged the committee to study Dutch Water Authorities as a model for watershed-based flood management, noting that Ontario’s conservation authorities, which operate similarly, had the lowest per capita disaster financial assistance payouts before their funding and authority were cut. He argued that the federal government should convene a Canada-wide strategy for climate adaptation and that watershed management organizations with a mandate to prevent development in flood zones could reduce risk, while also aligning with reconciliation efforts.
Rebecca Trowell, from the Red River Basin Commission, emphasized that protecting residents from both drought and flood requires long-term, basin-wide thinking and investment in natural infrastructure. She noted that cross-border coordination with the U.S. is challenging because studies often stop at the border, and that overland flooding is the biggest risk in the basin, with climate projections pointing to more variable precipitation and higher temperatures.
After the testimony, a motion was moved to invite the CEO of the Major Projects Office to appear quarterly for the duration of the Parliament. The motion was not adopted due to a lack of unanimous consent, as some members argued it was filed late and that quarterly appearances were unnecessary.
AI-generated summary — may contain errors; verify against the official evidence.